A plan to replace manual weight records
Four phases that keep the change small, visible and safe.
Phase 1, Map
Follow one weight from the scale to the ERP. Note every place it is written, typed or copied.
Phase 2, Define
Decide the fields every record needs (item, order or lot, weight, time, operator) and where the data must end up.
Get the full blueprint
Get your free workflow review
Choose a time in your timezone. Google Calendar sends a Meet link for a 30-minute call with an engineer.
- 30 minutes with an engineer
- A one-page plan you keep
- No obligation
Pick a free time. The Meet link arrives in the calendar email.
Choose a time